Skip to main content

Bathroom remodeling in Aurora, CO

For homeowners replacing an aging bathroom, changing a tub or shower area, or planning a focused update instead of a full reconstruction. LV Tile handles full and partial bathroom remodels with a written scope and timeline.

Based in Aurora, LV Tile serves Parker, Highlands Ranch, Littleton, Englewood, Castle Rock, Castle Pines, Fox Hill, Denver, Commerce City, Denver Tech Center and Cherry Creek.

What a bathroom remodel can include

A full remodel and a partial update need different scopes. The written plan identifies what will be changed, what will remain and which bathroom and shower details are part of the work.

Included in an agreed scope

  • Full and partial bathroom remodeling with a written scope and timeline.
  • Bathroom tile installation using Porcelain, Ceramic, Mosaic, Natural stone, Marble, Glass tile.
  • Walk-in showers and tub-to-shower conversions when included in the remodel.
  • Shower pan work and waterproofing appropriate to the project.
  • Niches, benches and other agreed finishing details.

Outside the confirmed scope

  • Plumbing, electrical and design services.
  • Work outside tile installation, bathroom remodeling, shower remodeling and shower pan repair.
  • Repairs, a fixed price or a construction schedule accepted before the project details are reviewed.

How the remodel is planned and built

1. Define the scope and review the room

The review separates finishes to keep from those to replace and looks for visible conditions that could change the work. Measurements, tile choices and shower details are considered together so the written scope describes the actual bathroom.

2. Remove, prepare and waterproof

Existing finishes are removed as needed, and the exposed surfaces are prepared for the new work. Schluter, wedi, LATICRETE, or traditional shower liner systems, selected as appropriate for each project. Flood testing is typically performed when applicable.

3. Install and finish the agreed details

Tile layout accounts for the room, shower openings, niches and transitions. The agreed tile and bathroom details are installed, followed by grout and the finishing items in the written scope. The completed work is reviewed with the homeowner.

An Aurora bathroom before remodeling has a beige-tile tub and shower enclosure beside a toilet.
The existing Aurora tub and shower enclosure before remodeling.
Light-colored wall boards and a recessed niche are visible in an Aurora shower during remodeling.
Wall boards and a recessed niche during the Aurora remodel.
A remodeled Arvada bathroom has a glass-enclosed walk-in shower beside a wall-hung toilet and a custom concrete sink.
The finished Arvada bathroom with a walk-in shower and custom details.

Conditions hidden by old finishes cannot always be identified at the first visit. If removal reveals damage, its effect on the scope needs to be reviewed before the related work continues.

What affects the estimate

Two bathrooms with the same dimensions can need very different work. A partial tile update is not the same scope as removing and rebuilding the shower and surrounding finishes.

The free estimate follows the actual scope instead of a package price. It gives the homeowner a written reference for the planned work.

  • Full or partial remodeling scope and the finishes being changed.
  • Removal, surface preparation and damaged sections found in the room.
  • Tile material, dimensions, pattern and cuts around bathroom details.
  • Shower construction, waterproofing, niches, benches and transitions.

Timeline and protection in your home

Construction time depends on the scope, material availability, repairs and setting or drying requirements. The written timeline is reviewed before work begins rather than reduced to one promise for every bathroom.

Preparing the estimate is a separate step. Simple estimates are usually ready the next day; detailed estimates can take up to about three days.

Self-adhesive protective film is used on carpet, protective paper on hardwood or laminate, and floor-to-ceiling plastic sheeting isolates especially dusty work. On larger projects, filtered dust-extraction or air-filtration equipment is used when necessary.

Discuss your bathroom remodel

Tell us what you want to keep, replace and change. We can review the scope and prepare a free estimate for the project.

Frequently asked questions

Can LV Tile handle both full and partial bathroom remodels?

Yes. LV Tile's confirmed scope includes full and partial bathroom remodels with a written scope and timeline. The work can combine bathroom tile, shower remodeling and shower pan repair when those items are included in the agreed project.

Which tile materials can be used in a bathroom?

Porcelain, Ceramic, Mosaic, Natural stone, Marble, Glass tile. The selected material still needs to suit its location and the way the bathroom or shower will be used.

How is the shower waterproofed?

Schluter, wedi, LATICRETE, or traditional shower liner systems, selected as appropriate for each project. Flood testing is typically performed when applicable. The choice depends on the project rather than combining every system in one assembly.

What affects a bathroom remodeling estimate?

The estimate depends on the full or partial scope, existing conditions, removal and preparation, tile and pattern choices, shower construction, waterproofing, and details such as niches or benches. LV Tile reviews those details before providing a free estimate rather than publishing a generic price.

How long does a bathroom remodel take?

Construction timing depends on the scope, existing conditions, material availability, repairs and drying requirements. The written scope and timeline are reviewed before work begins. Estimate turnaround is separate: Simple estimates are usually ready the next day; detailed estimates can take up to about three days.

Do I need to pay a deposit before work begins?

No deposit before work begins. The first 30% progress payment is collected after work has started, typically after day 1, 2, or 3. Subsequent payments are collected in stages as work progresses and completed work is billed. Payments are accepted by check or card.

Can LV Tile help with permits?

Help with the permitting process is available when permits are required.

What warranty covers bathroom remodeling workmanship?

3-year workmanship warranty. Excludes cracking or damage caused by foundation or structural movement and damage from improper tile care or maintenance.

  • Tile Installation

    Porcelain, ceramic, mosaic, natural stone, marble and glass tile, with preparation suited to each project.

  • Shower Remodeling

    Walk-in showers and tub-to-shower conversions built to stay dry.

  • Shower Pan Repair

    Leaking shower floor? We find the cause before we quote the fix.

Let's talk about your project

Tell us about your tile, bathroom or shower project and request a free estimate.

We typically respond to new inquiries within about one day.